Recent Wastewater Experience | |||
|
|||
Bunker Hill, Indiana - WWTP Ladd Engineering, Inc. was hired midway through the construction phase of the project to perform construction engineering and inspection services. The treatment plant project consisted of a rotating fine screen, influent lift station, two 150,000 gallon per day packaged type extended aeration activated sludge tanks, ultraviolet light disinfection, sludge bag processing system, control building modifications, standby generator, electrical and site work. The project cost was $2.8 million and was funded with a SRF loan. |