Colfax, Indiana - Treatment Plant

Ladd Engineering, Inc prepared design plans, specifications and bidding documents and provided construction engineering and inspection services for upgrading the Town's wastewater treatment plant. The project upgrades included new variable frequency drive, lift station pumps and controls, new flow splitter box, 300,000 gallon flow equalization tank, piping and valves, electrical and site work. The project cost was $685,000 and was funded with a CFF grant and bond issue.